Aberporth road to close for two months for drainage works

This set of temporary traffic lights on the B4333 has been a thorn in the side of Aberporth residents and motorists for the past year – now Ceredigion County Council traffic chiefs have confirmed the road will be closed for around two months to allow <i>(Image: Supplied)</i>
This set of temporary traffic lights on the B4333 has been a thorn in the side of Aberporth residents and motorists for the past year – now Ceredigion County Council traffic chiefs have confirmed the road will be closed for around two months to allow (Image: Supplied)
This article is brought to you by our exclusive subscriber partnership with our sister title USA Today, and has been written by our American colleagues. It does not necessarily reflect the view of The Herald.

ABERPORTH motorists are facing considerable disruption following the news that Ceredigion County Council is poised to close the B4333 road between Tanygroes and Aberporth for around two months.

Back in March, the Tivyside reported that local councillors were demanding action on a damaged section of the road on the outskirts of the village after residents and drivers complained about a set of temporary traffic lights at Cae Gwyn.

In an email to community clerk Vanessa Owens, the local authority said the lights had been erected for health and safety reasons due to failure of the drainage system and carriageway.

Now highway chiefs have confirmed that work to replace approximately 600 metres of the ‘failed or failing’ highway surface water system will begin next week and is expected to continue until November 20.

“Works were deferred over the summer holiday/tourist season,” a county council spokesperson told the Tivyside.

“The works contract period is 10 weeks to complete, and the works will be completed as soon as they can.

“The road closure is required to safeguard both contractor staff and the general public/road user.

“It is confirmed that the contractor will commence these works on Monday, September 14.”

Aberporth Community Council has welcomed the ‘essential’ works which local county councillor Gethin Davies told the Tivyside needed to be urgently carried out.

“A broken pipe damaged the road surface there last November, and that set of traffic lights has been there ever since,” he said.

“Historically, there have been problems with water for a long time at that location, so we need to see the road sorted out once and for all because if we have a really wet winter we would be back to square one.”

Get involved
with the news

Send your news & photos